Shear Walls and Core Wall Inspection Checklist


  • Approved shop drawings and Authorities drawings
  • Dimensions
  • Vertical reinforcement
  • Vertical reinforcement overlap
  • Top level of concrete pour
  • MEP Clearances and lift clearance where applicable
  • Concrete spacers / cover blocks
  • Safety
  • Cleaning
  • Alignment
  • Tightening of bars
  • Number and diameter of starter bars
  • Level of trimming the vertical bars in slabs or beams
  • Horizontal bars and confinement
  • Side chute for pouring the concrete in heights not exceeding 1.5 m if not possible with an extension pipe
  • Round corners